Clarke County, Virginia

Remodeling, additions and outbuildings in Clarke County

Clarke County's houses are older and stand farther apart than Loudoun's: farmhouses, old houses in town, and land with room to build. Work here starts with what the house and the land already are, and with the well, the septic system and the County's permits, which we handle.

Where
Across the countyBerryville, Boyce and the farms between
Wells and septic
Checked firstthe Health Department's approval leads
Permits
Zoning, then buildingthe County reviews both together
Your price
In 48 hourswritten and itemized, after the visit

The houses here

Old houses, farmhouses and room to build.

Many of the county's houses are old ones, some of them built before 1940, and nearly all stand on their own ground.

An old house rewards care. We open it up carefully, and what we find is priced in writing before it is fixed.

  • The old house brought forward

    Plaster walls, wiring and plumbing from several generations, and rooms worth keeping. Remodeled room by room or as one job, with the trades scheduled once. New homes and whole-home remodeling

  • The porch

    A covered porch is how an old house meets the weather. Floors, framing, columns and rails repaired or rebuilt to match what is there. Porches, decks & outdoor spaces

  • The addition

    More room at the back of a farmhouse, tied into the house it joins. Where the house is on a septic system, the Health Department looks at the plan before the County does.

  • A second dwelling

    The County allows a second dwelling inside a house in its rural districts, and smaller separate ones on larger lots. What your land allows is the first thing we find out. ADUs, cottages, shops and barns

  • Barns, shops and sheds

    A workshop, a garage, a run-in shed or a barn. A farm building may be let off the building permit by the County, case by case. It needs a zoning permit all the same.

Approvals in Clarke County

A zoning permit, a building permit, and the Health Department where there is a well or septic system.

Clarke County's Building Department reviews permitted work across the county, Berryville and Boyce included. A zoning permit comes first, and the County reviews the two together. We prepare and file both.

  • Clarke County. A zoning permit is required for a new home, an addition, a deck or porch, a garage or a shed, and it comes before the building permit. The two can be reviewed at the same time.
  • Remodeling. Finishing a basement or any unfinished space needs a building permit. So does removing or adding a wall.
  • Berryville. Inside the town, Berryville issues its own zoning permit first. The building permit is the County's.
  • Berryville historic district. New construction and additions that can be seen from the street need a certificate of appropriateness from the town's Architectural Review Board. An open deck at the back of a house is excepted.
  • Boyce. The County's planning staff act as the town's zoning administrator.
  • Wells and septic. The Health Department, part of the Lord Fairfax Health District, permits every well and septic system in the county. Where a project uses one, its approval comes before the zoning and building permits. A septic system is sized by the number of bedrooms it serves.
  • Farm buildings. The County's Building Official may exempt an agricultural building from the building permit, building by building. A zoning permit is still required.

Sources, read November 2026: Clarke County, Building Department, Clarke County, permit guides, Clarke County Guidance Manual, Permit Applications Generally, Clarke County Guidance Manual, Constructing Agricultural Buildings, Clarke County, Health Department, Town of Berryville, Zoning Ordinance, Town of Berryville, Architectural Review Board. Rules change; we confirm them for your address before the price is written.

Questions

Questions about building in Clarke County

Something else on your mind? Call 571-601-1102 and ask.

Do you work in my part of Clarke County?

Yes. We work across the county: Berryville, Boyce, and the farms and neighborhoods between them. We are based in Leesburg, one county to the east.

Do I need a permit?

For an addition, a deck, a porch, a garage or a shed: a zoning permit, and in most cases a building permit. For remodeling: a building permit when a basement is finished or a wall is removed or added. We sort out what applies before the price is written, and file whatever is required.

My house has a well and a septic system. Does that change the job?

It can. The Health Department permits wells and septic systems, and where a project uses one, its approval comes before the County's permits. A septic system is sized by the bedrooms it serves, so we find out what yours allows before the plan is drawn.

My house is in Berryville's historic district. What is different?

Work that can be seen from the street, such as an addition or a new building, needs a certificate of appropriateness from the town's Architectural Review Board, and then the town's zoning permit. We prepare the drawings the board asks for.

Do you build barns and workshops?

Yes: workshops, garages, sheds and barns. A farm building may be exempt from the building permit at the County's discretion, and it needs a zoning permit either way.

How soon can you come and look?

We reply the same day and usually come to look within 48 hours. The visit is free, and a written, itemized price follows within 48 hours of the visit for most projects.

Get a written price

Tell us about your Clarke County project.

The visit is free and there is no pressure. If the timing is not right, we will say so.

  1. We reply the same day. A short call to understand the project.
  2. We come to look. Usually within 48 hours, with a tape and a camera.
  3. You get a written price. Itemized, within 48 hours of the visit for most projects.

Rather talk it through? Call 571-601-1102 or write to info@cedarpost.com.

Call 571-601-1102 Get a price