Now booking winter projects. Get a written price

Bathroom remodeling

Bathroom remodeling in Loudoun County

The bathroom is the smallest room in the house and the one with the most trades in it. We run all of them: demolition, licensed plumbers and electricians, waterproofing, tile, glass, vanity and paint, with one person responsible for the lot.

TILE TO THE CEILING, A NICHE AT HAND HEIGHT, AND THE WATERPROOFING YOU NEVER SEE.
Bathroom elevationCedarpost Builders
First visit
Freeour builder comes to look and measure
Time on site
2 to 4 weekstypical for one bathroom
Behind the tile
Waterproofedevery shower we build
Your price
In 48 hourswritten and itemized, after the visit

What is included

What a bathroom remodel includes

What you see in a bathroom is tile and glass. What decides whether it lasts is what you do not see: the slope of the shower floor, the waterproofing behind the tile and the fan that takes the steam out.

  • Demolition and protection

    The old room out to the studs where it needs it, with floors and stairs on the way out covered.

  • Plumbing and electrical

    New valves, drains, a quiet fan ducted outside, lighting and protected outlets, done by licensed trade contractors.

  • Waterproofing

    A continuous waterproof layer behind the shower tile, checked before the tile goes on.

  • Tile

    Floors, shower walls to the ceiling and a niche at hand height, laid out so the cuts land where you do not look.

  • Vanity, top and glass

    Set level, plumbed and sealed. Glass measured after the tile is finished so it fits.

  • Paint and trim

    Moisture-tolerant paint, new casing and base, and the accessories hung where you want them.

From our projects

Primary baths, a powder room and tiled showers.

From a primary suite to a powder room, the finished details show the character of each room.

The primary bath combines pale stone finishes with a clear glass shower. (open the photograph larger)
FinishedThe primary bath combines pale stone finishes with a clear glass shower.
The completed guest-house primary bathroom, with double vanity, tiled shower and glass enclosure. (open the photograph larger)
FinishedThe completed guest-house primary bathroom, with double vanity, tiled shower and glass enclosure.
Botanical wallpaper and a blue-framed mirror give the powder room character. (open the photograph larger)
FinishedBotanical wallpaper and a blue-framed mirror give the powder room character.
A white vanity, framed mirrors and coordinated lighting brighten a secondary bathroom. (open the photograph larger)
FinishedA white vanity, framed mirrors and coordinated lighting brighten a secondary bathroom.
The completed tiled shower and glass enclosure in the guest-house primary bathroom. (open the photograph larger)
FinishedThe completed tiled shower and glass enclosure in the guest-house primary bathroom.
A completed tiled shower with a recessed niche and hexagonal floor. (open the photograph larger)
FinishedA completed tiled shower with a recessed niche and hexagonal floor.

One bath, from the original to the finished room

A guest-house primary bath: the original shower, the demolition, the tile and vanity going in, and the finished double vanity.

The original guest-house bathroom before the primary-bath remodel. (open the photograph larger)
BeforeThe original guest-house bathroom before the primary-bath remodel.
The guest-house bathroom during demolition and shower reconstruction. (open the photograph larger)
During the workThe guest-house bathroom during demolition and shower reconstruction.
Tile and double vanity installed before the guest-house bathroom fixtures and enclosure were finished. (open the photograph larger)
During the workTile and double vanity installed before the guest-house bathroom fixtures and enclosure were finished.
The completed double vanity in the remodeled guest-house primary bathroom. (open the photograph larger)
FinishedThe completed double vanity in the remodeled guest-house primary bathroom.

The projects

All projects

Your price

How a bathroom is priced

A bathroom is a small room with every trade in it, so the price turns on what stays and what moves. A refresh keeps the tub or shower. A full remodel goes back to the studs. Our builder sees the room first, the visit is free, and a written, itemized price follows within 48 hours.

Tub or shower stays

Refresh

New everything except the wet area, for a hall bath or powder room that works but looks its age.

  • Vanity, top, faucet and toilet
  • Lighting, fan, mirror and paint
  • New floor

Most common

Full remodel

Out to the studs and rebuilt in the same layout.

  • Tile shower or new tub, waterproofed
  • Tile floor, vanity and top
  • Fan, lighting and glass

A new layout

Primary bath rework

The corner tub comes out, the shower grows and the vanity becomes two.

  • Fixtures and drains relocated
  • Large walk-in shower with bench and niche
  • Double vanity and new lighting plan

What moves the price

  • Tile. How much of it, how large and how intricate the pattern.
  • Moving drains. A toilet or shower drain runs through the floor framing, so moving one means opening the floor or the ceiling below.
  • Glass. A frameless enclosure is made to measure and priced by size.
  • What is behind the wall. A slow leak around an old tub is common. We price the repair in writing before doing it.

The visit is free. Your price is written and itemized after it, and any change after that is priced and signed before the work happens.

How the job goes

From first look to first shower

  1. Day one

    We come to look

    Our builder measures, checks the floor and the room below, and asks how you use the bathroom now.

  2. Within 48 hours

    A written price

    Itemized scope, what is not included, the payment schedule and a target start.

  3. Before any demolition

    Selections and ordering

    Tile, vanity, fixtures and glass are chosen and ordered so the room is out of service for as short a time as possible.

  4. 2 to 4 weeks

    Build

    Demolition, rough-ins, waterproofing, tile, fixtures and paint, with a photo update every evening.

  5. The last day

    Walkthrough

    Everything working and sealed, punch list closed together, then the final payment.

How we work, in full

Building it here

Bathrooms in Loudoun homes

Primary bathrooms from the late 1990s and 2000s tend to share a plan: a large corner tub that rarely gets used and a small fiberglass shower that gets used every day.

  • Trading the tub for a shower. Taking out the corner tub and building a walk-in shower in its place is one of the most useful changes you can make to a bath of that era.
  • Permits depend on the work. Moving drains or adding circuits needs plumbing and electrical permits. We work out what applies before the price is written and file what is required.
  • Keep one bathroom working. We do one bathroom at a time so the house is never without one.

Questions

Bathroom questions we hear most

Something else on your mind? Call 571-601-1102 and ask.

How long does a bathroom remodel take?

Two to four weeks on site is typical for one bathroom. Tile and its waterproofing cannot be rushed, and the glass is measured only after the tile is done.

Can we use the bathroom during the work?

No. Plan on that bathroom being out of service from demolition to the last day. We do one at a time so there is always another.

Why is moving a toilet or a shower so expensive?

Because the drain is in the floor. Moving it means opening the floor framing, or the ceiling of the room below, and running new pipe with the right slope.

Can you turn my tub into a shower?

Yes. It is one of the most common requests. The drain is resized, the floor sloped and the whole enclosure waterproofed before tile.

Do you handle the permits?

Yes. We work out what the job needs, file it and meet the inspectors.

Who does the electrical and plumbing?

Licensed electricians, plumbers and heating and cooling contractors, working under our contract. We schedule them, supervise them and answer for the finished job.

Will the price change once work starts?

Not unless the plan does. If you want something added, or we open a wall and find something nobody could have seen, the change is priced and signed before that work happens. No surprise charges at the end.

How do payments work?

The payment schedule is written into the contract and tied to progress on the job. The final payment is due after we have walked the finished work together and closed the punch list.

Get a written price

Tell us about your bathroom.

The visit is free and there is no pressure. If the timing is not right, we will say so.

  1. We reply the same day. A short call to understand the project.
  2. We come to look. Usually within 48 hours, with a tape and a camera.
  3. You get a written price. Itemized, within 48 hours of the visit for most projects.

Rather talk it through? Call 571-601-1102 or write to info@cedarpost.com.

Call 571-601-1102 Get a price