Same layout, new surfaces
Refresh
The kitchen you have, made new. Nothing moves, so the plumbing and wiring stay where they are.
- New counters, sink and faucet
- Cabinet fronts replaced or boxes painted
- Backsplash, lighting and hardware
Now booking winter projects. Get a written price
Kitchen remodeling
A twenty-five-year-old kitchen usually has a sound layout and tired everything else. We replace counters, cabinets or just their fronts, tile, lighting and floors. And we will tell you plainly when moving a wall or a sink is worth the money and when it is not.
What is included
A kitchen is the room where every trade meets in the smallest space. One person runs all of it, in the right order, so the counter fabricator is not standing in an empty room waiting for cabinets.
New cabinets, or new doors and drawer fronts on boxes that are still sound. Either way they are laid out and drawn before they are ordered.
Templated after the cabinets are set, so the seams and the sink land where they should.
Sinks, disposals, gas ranges, under-cabinet and recessed lighting, and the circuits modern appliances need, done by licensed trade contractors.
Hardwood patched and refinished to match, or new tile or plank carried through to the next room.
Opening a kitchen to the family room, with the structure checked and carried properly.
Crown, casing and the last coat, done after everything else is in.
From our projects
The original kitchen, the cabinets going in and the finished room, with its range wall and the breakfast room beside it. Then a compact guest-house kitchen.






Your price
Most of what we expect to build are refreshes: the same layout with new surfaces. New cabinets throughout or a new layout is a bigger job. Either way, our builder sees the room first, the visit is free, and a written, itemized price follows within 48 hours.
Same layout, new surfaces
The kitchen you have, made new. Nothing moves, so the plumbing and wiring stay where they are.
Same footprint, all new
Everything out and new cabinets in, in the same arrangement.
A new layout
The sink moves, an island goes in or a wall comes out.
The visit is free. Your price is written and itemized after it, and any change after that is priced and signed before the work happens.
How the job goes
Day one
Our builder measures the room, looks at the cabinets, the floor and what is on the other side of each wall.
Within 48 hours
Itemized scope, what is not included, the payment schedule and a target start.
Before any demolition
Cabinets, counters and tile are chosen, drawn and ordered. Nothing is torn out until the materials have a delivery date.
4 to 8 weeks
Demolition, rough-ins, cabinets, counters, tile and paint, with a photo update every evening.
The last day
Everything working, punch list closed together, then the final payment.
Building it here
Much of Loudoun County was built in the 1990s and 2000s. Many of those homes still have the builder's original kitchen: oak or maple cabinets, a soffit over the uppers, and a counter that has seen twenty Thanksgivings.
Most kitchens take four to eight weeks on site. The longer wait is usually before we start, while cabinets are built and shipped, which is why we do not take anything apart until the materials have a delivery date.
Often, yes. If the boxes are sound, new doors, drawer fronts and hardware, or a proper paint job, change the room for a good deal less than new cabinets.
Yes. Whether a kitchen needs them depends on the work. We work that out before the price is written, file what is required and meet the inspectors.
Yes. Plan on being without the kitchen for the length of the job. We help you set up a temporary corner for the basics and keep the work area closed off.
Licensed electricians, plumbers and heating and cooling contractors, working under our contract. We schedule them, supervise them and answer for the finished job.
Not unless the plan does. If you want something added, or we open a wall and find something nobody could have seen, the change is priced and signed before that work happens. No surprise charges at the end.
The payment schedule is written into the contract and tied to progress on the job. The final payment is due after we have walked the finished work together and closed the punch list.
Get a written price
The visit is free and there is no pressure. If the timing is not right, we will say so.
Rather talk it through? Call 571-601-1102 or write to info@cedarpost.com.
An automated assistant, not a person. It takes down your project so someone at Cedarpost can call you. Rather talk to a person? Call 571-601-1102.
Check what the assistant took down, then send it.